THE BIOSOLAR HOUSE – ERECTION

Now that all the major elements are prefabricated, walls are craned into the tracking plates and locked and screwed in place, followed by the roof and installation of the windows.

This process takes two to three days. No rain is paramount as the construction needs to stay dry.

Walls

Roof

Windows

Windows, either double- or triple-glazed, are installed next to complete the weatherproofing.

These are followed by external cladding, preparing everything for the internal fit-out.